Gov. DeSantis announces nearly $150 million to communities for infrastructure

0
4093

Gov. Ron DeSantis has announced that more than $148 million has been awarded to communities through the Florida Department of Economic Opportunity’s (DEO) Rebuild Florida Mitigation General Infrastructure Program.

The funds are allocated to the state through the U.S. Department of Housing and Urban Development’s (HUD) Community Development Block Grant – Mitigation (CDBG-MIT) program formed in response to the 2016 to 2017 presidentially declared disasters.

The DEO is awarding the following communities funding through the Rebuild Florida Mitigation General Infrastructure Program:

Broward County ($6,250,000) – to construct an interconnect between the Broward County Reuse Facility and the City of Pompano Beach’s OASIS Reuse facility.

City of Arcadia ($4,823,579) – to widen a stormwater tributary to provide additional storage during storm events to better control flood volume.

City of Avon Park ($670,623) – to improve the existing potable water system through replacement of asbestos pipes with PVC piping, adding additional bore to improve water pressure, and to install an upgraded chlorine system.

City of Doral ($1,000,000) – to reduce the frequency and severity of stormwater flooding by providing a positive-gravity drainage outfall discharging into the NW 58th Street canal.

City of Fort Lauderdale ($10,500,000) – to replace aging and undersized stormwater infrastructure with new infrastructure systems that help with neighborhood flooding issues and provide better water quality treatment prior to releasing into the intracoastal waterway.

City of Key West ($3,099,159) – to install tide valves at 40 stormwater outfall points of discharge to address saltwater flooding of roadways, sidewalks, and low-lying properties caused by high tides.

City of Key West ($6,336,165) – to design and construct a pump-assist injection well to address flooding in a low-lying area that collects significant runoff.

City of Lakeland ($42,986,390) – to establish a multi-component project in partnership with Bonnet Springs Park which focuses on increasing flood storage capacity to the drainage basin by improving the stormwater infrastructure and watershed quality.

City of Lauderhill ($3,125,215) – to complete water and sewer line improvement projects.

City of Miami ($13,497,843) – to retrofit portions of existing seawall, construct new sea wall sections, and other coastal resiliency improvements.

City of Miami ($1,216,963) – to implement roadway resiliency improvements to NW 17th Street, between NW 27th Avenue and NW 32nd Avenue. Improvements include the installation of a drainage system, exfiltration trench, storm inlets, accessibility ramps, and swales.

City of North Miami Beach ($6,000,000) – to implement system-wide improvements to the sewer collection system that protects public health and natural water resources.

City of North Miami Beach ($11,700,000) – to enhance the water transmission and distribution system to improve water quality, fire flow capacity, reliability, and resiliency.

City of Orlando ($2,850,000) – to develop six resiliency hubs that will provide services to low- and moderate-income communities in the recovery phase of a disaster.

City of Sebring ($2,605,428) – to complete fire protection resiliency, water quality, and water conservation infrastructure improvements.

City of Sebring ($3,515,580) – to harden facilities that are part of the cities sanitary sewer collection system.

City of West Palm Beach ($16,764,610) – to build resilient seawalls, improve storm water quality, and develop living shorelines, pedestrian hardscaping, and native landscaping.

DeSoto County ($3,757,012) – to replace decaying drainage system infrastructure to significantly increase service life and reduce the possibility of flooding.

DeSoto County ($3,273,575) – to repair a bridge used as an evacuation route during storms.

Osceola County ($4,689,320) – to modify and adapt existing drainage elements to substantially reduce repetitive flooding.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.