GCM Contracting Solutions builds new flex warehouse in Cape Coral 

0
3082
GCM 1

GCM Contracting Solutions says it has started building East Cape Flex, a 38,400 sq. ft. flex warehouse facility with dock-level loading bays. 

The tilt-wall structure in East Cape Commerce Park will feature eight separate storefront sections for future sectioning and tenant requirements, the contractor says.  The work is to be completed in less than three months.

The tilt-wall method will “provide superior storm protection and increase durability as well as resale value,” the contractor says in a news release. “Tilt-wall construction also offers built-in fire, sound, and heat insulation.”

GCM-2

GCM Contracting is the perfect fit for this project,” said project manager Rudley Lewis. “We are a leader in tilt-up construction and honored to be a part of it,”.

Tilt and wall construction utilizes large slabs of concrete or tilt-up panels rather than traditional metal building or concrete block (cmu) construction techniques. “While GCM is a competitive provider of both solutions, it’s earned a reputation as the premier tilt wall specialist in Southwest Florida,” the statement says.

Thanks to the fast construction of East Cape Flex, developers or commercial real estate agents will be able place tenants quicker than the majority of other construction projects. “Our Cape Coral flex warehouse is an attractive option for any business that requires both office or retail space and has the need for high-bay storage, manufacturing, or production. They’ll find value in its aesthetically pleasing front paired andextremely functional back ,” Lewis said.. 

LEAVE A REPLY

Please enter your comment!
Please enter your name here